It's Sunday on what should have been the first week of construction.
Ok, maybe nothing was going to be built this week,but we were at least expecting a hole in the ground.
We talked to the contractor on the Friday when they tore down the garage and he told us that he would need a gas meter locate to be done before they could start digging. Monday I came home for lunch and there was the gas guy doing the meter locate.Perfect I thought,things should be rolling soon.
Tuesday brought rain all day so I figured this would hold things up for sure.And it did.
Wednesday comes and still nothing! No contractor or sign of him at all.
Thursday rolls around,my wife informs me that the contractor poked his head in the backyard really quickly around 8am and that was the last we have seen of him.
To top off this week of nothing going on, we had to dish out about $2000 out of our pocket to cover the cost of a furnace down payment($1000) the cost of electrical materials($600) and the cost to have the hydro disconnected and reconnected($391)what a
RIP OFF!! I guess they have to make up the money they are going to lose while the hydro is off because we all know that the hydro companies are
REALLY hurting!! Brutal!
What makes this whole thing worse is the fact that we can't actually use any of the money we do have for the renovations until the contractor completes a certain amount of work.It works like this.
Before the next amount of money can be released, the bank sends over an inspector to make sure a certain amount of work is completed.While this is a good thing in certain situations,when your dealing with a smaller independent contractor they don't have quite the budget, therefore they need more money up front which makes this not really that good for us.I say that because now we have to somehow front any money for all the little things that come up,like permits,flooring and such.Now this has created a situation were money is super tight.I even called the bank to see if we could have access to any cash at all,you can guess by this post what the answer was.
Next week promises to be better! I was told by my brother who was told by a friend who was talking to our contractor that he was going to start digging this Monday.Is it bad that we have to hear this from other people,or is it just me?
I guess to us it doesn't really matter who says it,just as long as something happens next week!!