I know it's been awhile since the last update,(about a week or so)I figured it was about time to get you up to speed.
Now you may be thinking that a lot has gone on in that week,but that's not the case.Our contractor is finishing up on another job so he can only get to our place on the week-end.Thus during the week not much happens.That's OK though because we know he is doing what he can for us to get the house ready as soon as he can.
Let's look at some pictures...
The finished tile.Well sort of, it still needs to be grouted.
Here you can see the tile border which we think looks really good.
The stairs going up to the new part.These were done with the same flooring that we used in the rest of the house.We were going to do the stairs with the tile, but we changed our mind and went with this instead.
Here is another look at the stairs.
As you can see here this ledge on the side of the stairs was done with the flooring we used in the house.Our contractor came with this idea because we really had no idea what to do there and we didn't really think to much about it.So this was a nice surprise when we seen this.
Another look at the ledge.That long brown thing on the stairs is a piece of rubber that is going to go on the edge of the ledge.
The new pot lights in the kitchen.
That gets you all up to date on the house.I will post updates as things move along.
Nice to see the floor, it looks really nice both the tile and the laminate. The lights in the kitchen will make it nice and bright in there, can't wait to come up and see it myself. Hopefully it will only be another week and then you can move in.
ReplyDeleteDiane
Yes hopefully it's only another week,but I am thinking it will be more.It will be nice when you can actually come to visit and see the house for yourself.
ReplyDelete